Technical and economic analysis of the project “change from open to pre-assembled networks” applied to an electric power distribution Company.
DOI:
https://doi.org/10.32645/13906925.943Keywords:
PLANREP, CNEL EP, VAN, TIR, Energy EfficiencyAbstract
In Ecuador there are electricity distribution companies that have losses due to theft in the most vulnerable areas of the country, which generates a great problem for companies to counteract these practices; for this reason, Electricity and Renewable Energy Management (MEER) since 2009, implemented a Losses Reduction Plan (PLANREP), which main objective was to neutralize this problem. One of the PLANREP projects implemented in CNEL Santo Domingo Business Unit ( where this study was applied) , it was the change from open to pre-assembled networks, so the objective of this project was to determine the technical and economic efficiency of the project that resulted in the total recovery of non-technical energy losses of the secondary circuits under study; in addition to the economic analysis was determined the rapid recovery of the investment being a profitable project for the distributor.
Downloads
Downloads
Published
Issue
Section
License
Copyright (c) 2020 Cristian Laverde Albarracín, Cristian Guamán Sánchez, Patricio Carrillo Escobar, Roberto Herrera Albarracín

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
El autor mantiene los derechos morales e intelectuales de su obra, autorizando a la editorial de la revista Sathiri la difusión y divulgación de su contenido con fines estrictamente académicos y de investigación, sin fines de lucro. Así mismo, se autoriza que la obra sea descargada y compartida con otras personas, siempre y cuando no sea alterada y se reconozca su autoria.